CSBP (fertilisers) asbestos cladding replacement

Project Info

  • Category

    1

CSBP (fertilisers) – Bunbury : Asbestos removal and re-cladding

This project required the removal of roof sheeting & asbestos and cleaning of purlin surfaces by brush only. We were required to install new Colorbond sheeting and safety mesh.

PRC Building Services Pty Ltd removed existing steel pipe and installed two additional tornado down pipe collections to the existing stainless steel gutter.

All new gutters and downpipes were installed to this large warehouse property. Hoop iron was installed in the centre of each to support the UPVC pipe we installed to connect to all four tornado collections. This is an example of how PRC Building Services Pty Ltd can complete an asbestos removal, roof sheet re-cladding and also perform building services like gutter systems and downpipes.

During the project, the team faced some wet and windy conditions, the warehouse was fully operational during the project and  zero safety incidents and zero factory down time were recorded.  The roof area was 1500m2 and also included 1300m2 of fibreglass wall sheeting that had to be replaced.